Thursday, 24 January 2013

Unit 22 LO3 Production


LO3 Production Roles:
Actors star in the drama and act out the script:


Player 1: Gift Mussa 


Player 2: Anthony Mayall
 

Scout: Shoaib Jussab 


Script writers  

Anthony Mayall, Gift Mussa and Shoaib Jussab 


Camera operators set up the shot size and angles and shoot the script:

Shoaib Jussab and Gift Mussa


Directors direct the crew - they organise the whole crew and instruct the actors and cameraman:
Shoaib Jussab


Editors-  put the clips into a structured order to make the scene and action flow in a realistic way: Anthony Mayall, Gift Mussa and Shoaib Jussab

LO3 Non diegetic sounds list and state where on the timeline (music, sound effects)

We used a RnB track at during the football montage scenes, we used them during training session and football trial scenes. 

Song: Written in Stars 

Artists: Tinie Tempeh

Edit decision list/ Technical
 (make note of the areas that need continuity editing: match on action; shot/ reverse shot/ 180 degree filming; cross cuts or cut away etc.) 

Over the shoulder shooting:
Gift and Anthony's conversation in the corridor (Scene 1)

Match on Action:
Opening door - going from the glass corridor into building (Scene 1)
Playing football (Scene 2)

Production meetings and production log
 individuals must show evidence of their contribution to the production)

Monday 12/11/12
Individual and group ideas: today we shared our ideas - we decided to come up with a new one that combined all of our ideas.

Thursday 15/11/12

Moodboard, Treatment, Synopsis: I made a moodboard on Photoshop, which I learnt from scratch. We all worked on developing the synopsis and treatment.

Monday 19/11/12
Script, Castings, Character and prop list: I wrote my props list, we didn't want to cast anyone else for the actors as we can play football.

Thursday 22/11/12
Locations and agreements:Got them signed. We went and found our locations, took photos.

Monday 26/11/12

Permissions, Budget, Risk assessment: I wrote the risk assessment, Gift was meant to do the budget but didn't finish it.

Thursday 29/11/12
Storyboard and lighting: none of us can draw so we wrote it instead

Monday 03/12/12
Production roles, shooting schedule and shot list: today we decided when and what we would film and we did some filming (Scene 3)

Thursday 06/12/12

Edit decision list and sound tracks: we listened to loads of different music and picked Tinie Tempeh's track - Written in the Stars

December Filming dates and editing

03/12/12 -Scene 3 - Changing Room - Gift and Shoaib (cameraman)
06/12/12 - Scene 2 and 4 - football - Astro Turf - Shoaib (cameraman)
13/12/12 - Scene 1 - Glass bridge conversation - Scene 1 - Shoaib (cameraman)
EDITING - I'm spending every lesson editing and learning the edit programme - Premier Pro
Evidence:
Production roles 
(define roles and list who worked as: director, actors, camera operator, editor etc.)


Budget research
(studio/ location hire, props and costumes,  camera and equipment costs, crew and catering costs)

PRODUCTION COSTS
Camera hire: £50.00 -200.00 per day
Location hire: £100.00 - £1,500.00 per day
Sports Equipment hire: £50.00
Actors per day: £250.00 - £600.00
Editing and edit suite hire: £400.00 - 800.00 per day
Camera operator: £250.00 - 350.00 per day


http://www.ivideoproduction.co.uk/so-how-much-does-video-production-cost/
http://www.justfilm.co.uk/video-production-costs.html
http://www.film-locations.co.uk/pages/fees.php
http://preproduction.4filmmaking.com/film-financing.html



COSTUME + PROPS:
Sports Direct: http://www.sportsdirect.co.uk/men/football-shirts/
                          http://www.sportsdirect.co.uk/mens-footwear/football-boots/

Football equipment: 
http://www.dcrsports.co.uk/categories/Football-Shop/
http://www.dcrsports.co.uk/products/-Spacemarkers.html
Men's clothes:http://www.topman.com/webapp/wcs/stores/servlet/TopCategoriesDisplay?storeId=12555&catalogId=33056&geoip=home


MUSIC license use: 
http://www.ipo.gov.uk/types/copy/c-other/c-other-faq/c-other-faq-lice/c-other-faq-lice-music.htm
http://www.reach.net/~scherer/p/copyhelp.htm
http://licensemusicnow.com/faq.htm
http://www.copyrightkids.org/permissioninformation.htm


CATERING:
http://www.farriersfayre.com/Welcome.html



Thursday, 3 January 2013

L03 Our single drama video and evaluation


Evaluation

Overall our single drama went well as it was made to a poor standard however we feel as a group that it could be improved in some areas, as it can be improved at the scene where Gift and Anthony are walking through the doors where they come to a standstill and all of sudden start having a conversation. This scene could be improved because it jumps from Gift and Anthony walking to them suddenly standing still and having a conversation making the video look unproffesional. We can improve this by adding another clip in between showing Gift and Anthony walking slightly more and showing them standing still and having there conversation.

Another scene which we could improve is the training session scene where Gift and Anthony are Training, we could improve this scene by making the scene shorter as we feel it is too long and we can improve it by doing more match on action and using more camera angles in this scene to make it look better as a whole.

Also the camera angles used in our film could be improved as we never used a wide variety of camera angles meaning that our film looked dull and does not meet professional. To meet professional standards we could go back on each scene and use a variety of camera angles in order to meet professional standards.

Also we could improve our overall film by adding effects to make it meet professional standards as adding effects would make the film look more entertaining and professional and we could use relevant music for our film as the music we used was completely irrelevant to our film meaning it could be changed for something more suitable to our film.